<nobr id="trzpf"><sub id="trzpf"><dfn id="trzpf"></dfn></sub></nobr>

        <thead id="trzpf"></thead>

      020-34901288




      Water paint for metal kettle, water cup

      Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Waterborne acrylic resin, amino resin, waterborne environmental pigments, water-borne additives Applicable products: The protection and decoration of the surface of stainless steel, such as water kettle, water cup, etc. Accessory products: SX-SHB series acrylic kettle lacquer SX-MB series scrylic water cup lacque




      Water paint for metal kettle, water cup





      Product description: Safety, health, non-pollution, low carbon and non-toxic
      Main components: Waterborne acrylic resin, amino resin, waterborne environmental pigments, water-borne additives
      Applicable products: The protection and decoration of the surface of stainless steel, such as water kettle, water cup, etc.
      Accessory products:
      SX-SHB series acrylic kettle lacquer
      SX-MB series scrylic water cup lacque


      (Guidance of construction technology)

      Single coating layer:Workpiece cleaning -->fire drying(air dry)  --> dust cleaning --> workpiece preheating --> painting(air/ static)  --> leveling(testing on line) --> baking --> finished products inspection
      Multi coating layer:Workpiece cleaning --> fire drying(air dry)--> dust cleaning --> workpiece preheating --> painting 1(air/ static) --> flashing off(air dry) --> painting 2(air/ static) --> leveling(testing on line) --> baking --> finished products inspection
      Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
      Base material treatment: The surface of the coated material should be clean and dry, if needs to spray thickness of the higher dry film (>30μm) at one time during the assembly line, suggest workpiece should be preheated (35-50℃), to avoid sagging uneven.
      Construction viscosity:Use pure water to adjust the viscosity and add 10%-30% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
      Drying condition: A series of water-based lacquer products must be baked at 145-165℃ by 20-30mins by the drying road, can be packed after cooling.

      Performance index:



      Test project

      Test method

      Test standard

      Aging test

      QUV-A tested for 48hours

      No obvious discoloration and yellowing

      Cross-cut test

      Draw the grid with cross-cut on the test the tape with the 45-90 degree direction bottle, and sticked on the pane with 3M tape, pressed on the tape for about 1 minutes with your thumb, quickly uncover the tape with the 45-90 degree direction of the test surface

      ≥4B, there is no lacquer shedding in the line area

      Water-cook test

      Put the test bottle and the bottle with cross-cut line into the 100℃ water bath for 30mins, and test them with cross-cut  method individually

      Paint film does not fall off,no decolorizing

      Color appearance

      Put the test bottle and sample on the white paper, compare with the sample in multi  angle visual

      The surface is  smooth, no pinholes, particles orange peel,bubbles  and other defects, no obvious color difference to the standard sample



      1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
      2.The painting room should be clean and tidy, no dust, ash and so on.
      3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
      4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
      5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
      6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
      7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


      Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
      Storage conditions: The product should be sealed and stored in the environment of
      0℃-40℃.












      Water paint for metal kettle, water cup

      Water paint for metal kettle, water cup

      Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Waterborne acrylic resin, amino resin, waterborne environmental pigments, water-borne additives Applicable products: The protection and decoration of the surface of stainless steel, such as water kettle, water cup, etc. Accessory products: SX-SHB series acrylic kettle lacquer SX-MB series scrylic water cup lacque

      Water paint for metal kettle, water cup





      Product description: Safety, health, non-pollution, low carbon and non-toxic
      Main components: Waterborne acrylic resin, amino resin, waterborne environmental pigments, water-borne additives
      Applicable products: The protection and decoration of the surface of stainless steel, such as water kettle, water cup, etc.
      Accessory products:
      SX-SHB series acrylic kettle lacquer
      SX-MB series scrylic water cup lacque


      (Guidance of construction technology)

      Single coating layer:Workpiece cleaning -->fire drying(air dry)  --> dust cleaning --> workpiece preheating --> painting(air/ static)  --> leveling(testing on line) --> baking --> finished products inspection
      Multi coating layer:Workpiece cleaning --> fire drying(air dry)--> dust cleaning --> workpiece preheating --> painting 1(air/ static) --> flashing off(air dry) --> painting 2(air/ static) --> leveling(testing on line) --> baking --> finished products inspection
      Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
      Base material treatment: The surface of the coated material should be clean and dry, if needs to spray thickness of the higher dry film (>30μm) at one time during the assembly line, suggest workpiece should be preheated (35-50℃), to avoid sagging uneven.
      Construction viscosity:Use pure water to adjust the viscosity and add 10%-30% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
      Drying condition: A series of water-based lacquer products must be baked at 145-165℃ by 20-30mins by the drying road, can be packed after cooling.

      Performance index:



      Test project

      Test method

      Test standard

      Aging test

      QUV-A tested for 48hours

      No obvious discoloration and yellowing

      Cross-cut test

      Draw the grid with cross-cut on the test the tape with the 45-90 degree direction bottle, and sticked on the pane with 3M tape, pressed on the tape for about 1 minutes with your thumb, quickly uncover the tape with the 45-90 degree direction of the test surface

      ≥4B, there is no lacquer shedding in the line area

      Water-cook test

      Put the test bottle and the bottle with cross-cut line into the 100℃ water bath for 30mins, and test them with cross-cut  method individually

      Paint film does not fall off,no decolorizing

      Color appearance

      Put the test bottle and sample on the white paper, compare with the sample in multi  angle visual

      The surface is  smooth, no pinholes, particles orange peel,bubbles  and other defects, no obvious color difference to the standard sample



      1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
      2.The painting room should be clean and tidy, no dust, ash and so on.
      3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
      4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
      5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
      6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
      7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


      Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
      Storage conditions: The product should be sealed and stored in the environment of
      0℃-40℃.







      邻居人妻不戴乳罩真的很危险_九九99久久精品国产_国模吧gogo裸体私拍_工口里番无遮挡全彩大全

          <nobr id="trzpf"><sub id="trzpf"><dfn id="trzpf"></dfn></sub></nobr>

            <thead id="trzpf"></thead>