<nobr id="trzpf"><sub id="trzpf"><dfn id="trzpf"></dfn></sub></nobr>

        <thead id="trzpf"></thead>

      020-34901288




      Glass products waterborne paint

      Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Waterborne acrylic resin, amino resin, waterborne epoxy resin, waterborne environmental pigments, water-borne additives Applicable products: Glass products protection and decoration Accessory products: High temperature lacquer for SX-AHB series of acrylic glass(Cosmetic bottle series) Lacquer for SX-AMB series of acrylic glass(wine bottle series) Lacquer for SX-BL series self-dried acrylic glass(decorative glass series)




      Glass products waterborne paint





      Product description: Safety, health, non-pollution, low carbon and non-toxic
      Main components: Waterborne acrylic resin, amino resin, waterborne epoxy resin, waterborne environmental pigments, water-borne additives
      Applicable products: Glass products protection and decoration
      Accessory products:
      High temperature lacquer for SX-AHB series of acrylic glass(Cosmetic bottle series)
      Lacquer for SX-AMB series of acrylic glass(wine bottle series)
      Lacquer for SX-BL series self-dried acrylic glass(decorative glass series)


      (Guidance of construction technology)

      Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
      Base material treatment: The surface of glass or ceramic needs to be washed and cleaned with the treatment agent. If needs to spray thickness of the higher dry film (> 30 mu m) at one time during the assembly line, suggest workpiece should be preheated (35-50℃), to avoid sagging uneven.
      Construction viscosity:Use pure water to adjust the viscosity and add 10%-30% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
      Drying condition: A series of water-based lacquer products must be baked at 160-190℃ by 15-30min by the drying road, can be packed after cooling. The self-dry paint series can be dried at normal temperature and can also be baked at low temperature to save the time. It is suggested that 60-80 ℃ * 20-30mins.


      Performance index:


      Test project

      Test method

      Test standard

      Aging test

      QUV-A tested for 48hours

      No obvious discoloration and yellowing

      Cross-cut test

      Draw the grid with cross-cut on the test bottle, and sticked on the pane with 3M tape, pressed on the tape for about 1 minutes with your thumb, quickly uncover the tape with the 45-90 degree direction of the test surface.

      ≥4B, there is no lacquer shedding in the line area

      Water resistance test

      Put the test bottle and the bottle with cross-cut line into the 40℃ water bath  for 50mins, and test them with cross-cut method individually.

      Paint film does not fall off,no decolorizing

      Wear resistance test

      Cooling the test bottle to room temperature, wrapping the grid paper flat on the table, the bottle closes to the grille paper, and  pushing the bottle back and forth on the grille paper 20 times with your hand.

      No obvious decolorizing,shedding and scratching

      Color appearance

      Put the test bottle and sample on the white paper, compare with the sample in multi angle visual.

      The surface is smooth, no pinholes, particles orange peel,bubbles and other defects,  no obvious color difference to the standard sample.

      Simulated transport test

      Put the test bottle in the grilles packing box , seal it well, then put it in an analog   transport vibrator wear-resistant instrument,reinforce, adjust the equipment 160 rotation /30mins vibration.

      No obvious scratch,or loss of lustre.



      1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
      2.The painting room should be clean and tidy, no dust, ash and so on.
      3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
      4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
      5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
      6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
      7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


      Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
      Storage conditions: The product should be sealed and stored in the environment of
      0℃-40℃.






      Hot products






      Glass products waterborne paint

      Glass products waterborne paint

      Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Waterborne acrylic resin, amino resin, waterborne epoxy resin, waterborne environmental pigments, water-borne additives Applicable products: Glass products protection and decoration Accessory products: High temperature lacquer for SX-AHB series of acrylic glass(Cosmetic bottle series) Lacquer for SX-AMB series of acrylic glass(wine bottle series) Lacquer for SX-BL series self-dried acrylic glass(decorative glass series)

      Glass products waterborne paint





      Product description: Safety, health, non-pollution, low carbon and non-toxic
      Main components: Waterborne acrylic resin, amino resin, waterborne epoxy resin, waterborne environmental pigments, water-borne additives
      Applicable products: Glass products protection and decoration
      Accessory products:
      High temperature lacquer for SX-AHB series of acrylic glass(Cosmetic bottle series)
      Lacquer for SX-AMB series of acrylic glass(wine bottle series)
      Lacquer for SX-BL series self-dried acrylic glass(decorative glass series)


      (Guidance of construction technology)

      Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
      Base material treatment: The surface of glass or ceramic needs to be washed and cleaned with the treatment agent. If needs to spray thickness of the higher dry film (> 30 mu m) at one time during the assembly line, suggest workpiece should be preheated (35-50℃), to avoid sagging uneven.
      Construction viscosity:Use pure water to adjust the viscosity and add 10%-30% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
      Drying condition: A series of water-based lacquer products must be baked at 160-190℃ by 15-30min by the drying road, can be packed after cooling. The self-dry paint series can be dried at normal temperature and can also be baked at low temperature to save the time. It is suggested that 60-80 ℃ * 20-30mins.


      Performance index:


      Test project

      Test method

      Test standard

      Aging test

      QUV-A tested for 48hours

      No obvious discoloration and yellowing

      Cross-cut test

      Draw the grid with cross-cut on the test bottle, and sticked on the pane with 3M tape, pressed on the tape for about 1 minutes with your thumb, quickly uncover the tape with the 45-90 degree direction of the test surface.

      ≥4B, there is no lacquer shedding in the line area

      Water resistance test

      Put the test bottle and the bottle with cross-cut line into the 40℃ water bath  for 50mins, and test them with cross-cut method individually.

      Paint film does not fall off,no decolorizing

      Wear resistance test

      Cooling the test bottle to room temperature, wrapping the grid paper flat on the table, the bottle closes to the grille paper, and  pushing the bottle back and forth on the grille paper 20 times with your hand.

      No obvious decolorizing,shedding and scratching

      Color appearance

      Put the test bottle and sample on the white paper, compare with the sample in multi angle visual.

      The surface is smooth, no pinholes, particles orange peel,bubbles and other defects,  no obvious color difference to the standard sample.

      Simulated transport test

      Put the test bottle in the grilles packing box , seal it well, then put it in an analog   transport vibrator wear-resistant instrument,reinforce, adjust the equipment 160 rotation /30mins vibration.

      No obvious scratch,or loss of lustre.



      1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
      2.The painting room should be clean and tidy, no dust, ash and so on.
      3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
      4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
      5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
      6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
      7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


      Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
      Storage conditions: The product should be sealed and stored in the environment of
      0℃-40℃.






      邻居人妻不戴乳罩真的很危险_九九99久久精品国产_国模吧gogo裸体私拍_工口里番无遮挡全彩大全

          <nobr id="trzpf"><sub id="trzpf"><dfn id="trzpf"></dfn></sub></nobr>

            <thead id="trzpf"></thead>